DO-178 First Article Inspection Checklist (FA
This DO-178 checklist is for the First Article Inspection (FAI). The purpose of carrying out a FAI is to give objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified and recorded.
This DO-178 checklist is for the First Article Inspection (FAI). The purpose of carrying out a FAI is to give objective evidence that all engineering, design and specification requirements are correctly understood, accounted for, verified and recorded.
Additional features | |
---|---|
Value 1 | 21 cm |
Value 2 | 700 gr. |
Value 3 | 10 person |
Value 4 | 14 cm |
Value 5 | plastic |
Sed velit quam, auctor id semper a, hendrerit eget justo. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Duis vel arcu pulvinar dolor tempus feugiat id in orci. Phasellus sed erat leo. Donec luctus, justo eget ultricies tristique, enim mauris bibendum orci, a sodales lectus purus ut lorem.
Sed velit quam, auctor id semper a, hendrerit eget justo. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Duis vel arcu pulvinar dolor tempus feugiat id in orci. Phasellus sed erat leo. Donec luctus, justo eget ultricies tristique, enim mauris bibendum orci, a sodales lectus purus ut lorem.